SELECTED TRADITIONAL ENERGY PROJECTS

Boiler house in Germany in Tekla

•structural design;

•calculation of foundation loads;

•fulfilling static calculation;

•3D modeling and development of workshop;

erection drawings for steel structure and equipment

Natural gas-fired mini CHP

Date:  2019

Location: Belarus

Type of services:

• Architectural Design
• Structural Design

• Piping Design

• Electrical Design

• HVAC Systems design
• Main Equipment selection
• Automation & Control (Eplan)
• Construction Supervision

Project description: 

This energy center is running on natural gas. The main equipment of the energy technology center are:
• Natural gas pumping units; 
• Gas-fired boilers;
• Absorption refrigerators

Architectural, Structural, HVAC, Pumping & Drainage, Process Engineering & Piping BIM Models were created in Revit.
 

 

The Biomass Fired CHP Plant

Date:  2019
Location: -

Type of services:

•Architectural, Structural, Electrical, Piping Design
• Main Equipment selection
• Automation & Control (Eplan)
• HVAC Systems design
• Construction Supervision

Project description: 

Considering the project complexity, all the main structures and systems were modeled in Revit with the Level of Detail up to LOD 400. Architectural, Structural, MEP and Process Engineering models were put together in one integral model for BIM Coordination. It has ensured smooth workow, more optimal design solutions and client involvement in the design process at all design stages.

Thermal Power Plant Reconstruction

 

 

Date:  2019
Location: Belarus

Type of services:

• Piping design

• Structural Design
• HVAC Systems design
• Construction Supervision

• Main Equipment selection

Project description: 

The project was aiming to reconstruct the boiler house with an obsolete steam boiler and replace it with a fire tube steam boiler. The new boiler should have capacity of at least 20 t/h steam and an operating pressure of up to 1.3 MPa.

 

 

Boiler-house for production plant

Date:  2019

Location: Belarus

Type of services:

• Master plan
• Equipment selection

• Layout design
• Piping
• Architectural, Structural,  Automation and Electrical design

• HVAC
• Water supply and Sanitation

Project description: 

ENECA has led the design process from end-to-end. For interdisciplinary collaboration, the architectural, structural and process engineering models were created in Revit. The interdisciplinary model helped to communicate with the client more efficiently and simplified the process of clash detection and elimination.

Belorusneft
Feasibility studies

“Photovoltaic power station at the Belorusneft main buildings. Total installed capacity - 55,6 МW” 
 

Heat and Power Plant for Greenhouse and Food Processing Facilities

Leningrad district (Russia)

Total thermal output: 26.8 MW,
Including CHP (gas engine): 12.8 MW thermal + 14MW electric
 

Communal unitary production enterprise “Kobrin Utility Company” 
Design and estimate documentation

“Reconstruction of boiler house №1 in Kobrin, Brest region with installation of cogeneration module with the capacity of 2 MW”
 

“Modernization of the energy technology complex based on gas engine piston units. Construction of the 3 module of gas turbine with an electrical power of 1.403 MW” at the address: Vitebsk, str. Gagarina, 119”

© 2020 Engineering & Consulting Company ENECA

  • LinkedIn Social Icon
  • Facebook Social Icon
  • Instagram Social Иконка